Coronial
QLDother

Ross, Matthew Trent

Deceased

Matthew Trent Ross

Demographics

25y, male

Date of death

2013-07-11

Finding date

2018-04-13

Cause of death

Electrocution

AI-generated summary

Matthew Ross, 25-year-old carpenter, died from electrocution at 5:07 PM on 11 July 2013 while installing guttering on construction scaffolding. His body completed an electrical circuit between a metal scaffold pole (hands) and metal guttering (legs). A damaged light fitting (Light Fitting Z) connected to a photo-electric cell activated at dusk was found to be the likely source. The coroner determined that if an RCD (safety switch) had been installed on the circuit, it would have detected the fault and prevented Matthew's death. Critical investigative lapses included failure to immediately seize the light fitting as evidence, loss of evidence continuity, delays of 2.5 years completing the investigation, and confusion regarding the scope of electrical isolation for modified demolition work. No RCDs were mandated on this existing circuit at the time.

AI-generated summary and tagging — may contain inaccuracies; refer to original finding for legal purposes.

Contributing factors

  • Damaged light fitting (Light Fitting Z) in contact with metal water pipe and scaffolding
  • Light fitting connected to photo-electric cell activating at dusk, timing coinciding with incident
  • Defective transposed earth and neutral conductors at Light Fitting Y on same circuit
  • Absence of Residual Current Device (RCD/safety switch) on circuit
  • Confusion regarding scope of electrical isolation when roof trusses were added to demolition work
  • Light fitting left unattached in eave cavity following soffit removal, unclear how it became disconnected
  • Failure to obtain new electrical isolation certificate when scope of work changed from initial demolition
  • Simultaneous contact between conductive scaffold and metal guttering completing circuit

Coroner's recommendations

  1. The Electrical Safety Office reconsider various options for mandatory fitting of Residual Current Devices (RCDs/safety switches), including cost benefit analysis, and circulate draft discussion paper to stakeholders and public for consultation prior to finalising policy position or advice to State Government
  2. The Office of Industrial Relations in conjunction with the Electrical Safety Office review circumstances and consider amendments to Demolition Work Code of Practice 2013 and Managing electrical risks in the workplace Code of Practice 2013 to mandate: an electrical isolation certificate be obtained by principal contractor for any demolition or dismantling work in building structures; any isolation certificate include clear plan and description of precise isolated area including cabling and fittings removed and details of isolation method including lockout and tag-out means and testing to prove de-energised protocols; that a further electrical isolation certificate be mandatory where there is any extension of scope of demolition and dismantling work
Full text

Related cases

Source and disclaimer

This page reproduces or summarises information from publicly available findings published by Australian coroners' courts. Coronial is an independent educational resource and is not affiliated with, endorsed by, or acting on behalf of any coronial court or government body.

Content may be incomplete, reformatted, or summarised. All court orders for redaction and non-publication are respected; documents with technically defective redaction have been excluded from the database entirely. Always refer to the original court publication for the authoritative record.

Copyright in original materials remains with the relevant government jurisdiction. AI-generated summaries and tagging are for educational purposes only, may contain inaccuracies, and must not be treated as legal documents. We welcome feedback for correction —